Good cooperation on the task resulted in a further extension of scope of works, ie.: the construction of the foundations of another furnace with use of 6 thous. cu. m. of concrete, pillar-slab structures and concrete work for other production buildings. Contract included works for 12 buildings. Due to the use of beam and block ceilings embedded in the reinforced concrete frames, the implementation required from the contractor a specific execution method to fit the design.
Scope of works: Comprehensive concrete work for the expansion of a plant for one of the largest manufacturers of glass - Saint Gobain. The works included a construction of a glass furnace, glass production line, glass cutting and assembly hall and three other glass production facility.
Client:
CFE Polska Sp. z o.o. Localization:
D±browa Górnicza Execution period:
05.2007 – 01.2008 Contract net value:
20 - 50 mln PLN Surface:
6 000 m3 Reinforced concrete works:
6 000 m3
Confirming an excellent reputation and market position as industrial reinforced concrete works contractor, AWBUD started, in February 2008, a specialized reinforced concrete works of the two-station ladle furnace for ArcelorMittal Poland. Reinforced concrete structures with capacity of 4.5 thousand cu. m. and earth works of 20 thous. cu. m. Scope of works included: foundation of furnaces and transfer cars, multifunctional building, reconstruction of underground utilities and piles head treatment.
nazwa zadania:
Budowa pieca kadziowego stalowni ArcellorMittal Poland S.A. Client:
PBPP Piecexport - Piecbud S.A. Localization:
D±browa Górnicza Execution period:
02.2008 – 07.2008 Contract net value:
< 20 mln PLN Reinforced concrete works:
4 500 m3
Earth works:
20 000 m3
As a subcontractor AWBUD has completed comprehensive reinforced concrete works: foundations, pillars, walls and concrete floors of the office building, production halls, social rooms, office and warehouse. The basic 10.80m pillars of the hall were made in the “wet” technology at the construction site. Cosmetics plant expansion in Garwolin was implemented in two stages.
Scope of works:
Client:
Avon Cosmetics Polska Sp. z o.o. Localization:
Garwolin Execution period:
2000
Broad scope of works included: foundation of the ladle furnace and chimney, rolling stand, rebuilding the foundations of production hall and extension of the hall. The construction of transfer car foundations, switching station, settling tank, water tunnel and the pumping station were also executed.
Scope of works: Continuation of works for CMC Zawiercie within increase of steel mills production capacity. Complete reinforced concrete work for the new wire rod bloc "Danielli" included 14 production line buildings and ancillary facilities.
Client:
CMC Zawiercie Sp. z o.o. Localization:
Zawiercie Execution period:
06.2008 – 07.2009 Contract net value:
50 - 100 mln PLN Reinforced concrete works:
21 000 m3
Earth works:
41 000 m3
General contracting of reinforced concrete works for extension of an existing wire rod block in Zawiercie, enabling the production of wire rod in coils, which is used in the steel and construction industry. Within this investment, AWBUD has completed reinforced concrete works of 4 thous. cu. m. with 6 thous. cu. m. use of poured concrete and 8 thous. cu. m. of earthworks.
nazwa zadania:
Rozbudowa linii walcowniczej MORGAN Client:
CMC Zawiercie Sp. z o.o. Localization:
Zawiercie Execution period:
10.2007 – 07.2008 Contract net value:
< 20 mln PLN Reinforced concrete Works:
4 000 m3
Earth works:
8 000 m3
AWBUD competed this task as a comprehensive contractor of industrial foundations, technological canals and foundations of buildings and concrete roads and stacking yards. The task consisted of nine, 900 m. long structures. All works were performed during continuous operation of production plant which required very precise coordination. Completion of the investment in time and the inclusion of railway siding for traffic has been recognized as a success by the Investor and confirmed by a letter of reference.
nazwa zadania:
dziewięć obiektów rozci±gniętych na długo¶ci 900 m Client:
Mostostal Kraków SA Localization:
D±browa Górnicza Execution period:
10.2004 - 06.2005 Contract net value:
< 20 mln PLN
Wire rod block with water management facilities execution was task with complex technological issues. Two Dorra settling tanks, tanks pumping stations and central pumping station were executed.
Client:
Huta Zawiercie S.A. Localization:
Zawiercie Execution period:
01.2000 - 10.2000 Contract net value:
< 5 mln PLN Prace żelbetowe:
11 700 m3
Foundations for two continous casting lines in steel mill in Zawiercie with comprehenisve technological installations. Within this project 8 thous cu. m. of concrete was build-in.
nazwa zadania:
fundamenty technologiczne dwóch linii Ci±głego Odlewania Stali oraz instalacje technologiczne Client:
Huta Zawiercie SA. Localization:
Zawiercie Execution period:
1999 Contract net value:
< 5 mln PLN Prace żelbetowe:
9.000 m3
Foundations of two continuous casting lines and technological installations in steel mill in Zawiercie.
Execution period:
2002 Contract net value:
< 20 mln PLN
Comprehensive reinforced concrete works of 13 thos. cu. m. at casting line, foundation of a rotary table, electrical wells, technological channels and foundations as well as a foundation foot. In order to meet the schedule and technological requirement of the one of the biggest steel manufacturers, works were executed in three shifts work system. Continous casting line in D±browa Górnicza was one of the biggest Mittal Steel investments in Poland.
Client:
Hochtief Polska Sp. z o.o. Localization:
D±browa Górnicza Execution period:
02.2006 - 08.2006 Contract net value:
< 5 mln PLN netto Prace żelbetowe:
14 000 m3