AWBUD in consortium with MOTA-ENGIL, the one of the biggest Portuguese construction company, was general contractor of a reinforced concrete structure for the biggest construction investment near Rybnik – FOCUS PARK RYBNIK. Our experience in specialized reinforced concrete works allowed us to work with Parkridge, one of the biggest and most prestigious commercial property investors in Europe.
Client:
Parkridge CE Retail Localization:
Rybnik Execution period:
03.2006 – 06.2007 Contract net value:
< 20 mln PLN Surface:
42 000 m2 Cubature:
200 000 m3
The two level underground parking and conference complex, built underneath the famous Jasna Góra Monastery. Complex architecture of the structure executed with use of elevation concrete. Execution of the cloister vault required special precision and compliance with established technologies.
This project was awarded with the Polish Architecture Icons, Exhibition presented 20 milestone civil investment with a special attention to architecture values, built in Poland after 1989.
Client:
Paulins Sanctuary, Jasna Góra Localization:
Częstochowa Execution period:
2000 Contract net value:
< 20 mln PLN External structures:
beams, pylons, slabs
Internal structures:
foundations, ceiling, slabs, stairs, ramps
Subcontract reinforced concrete works package for sports and entertainment arena in D±browa Górnicza, one of the most modern structures of that kind in Silesia region. Arena is located in Haller's city park. Within the investment, parking lot for 250 cars was executed.
Client:
UM D±browa Górnicza Localization:
D±browa Górnicza Execution period:
2003 Contract net value:
< 20 mln PLN Surface:
7 586 m2 Arena:
44x24m
Auditorium:
3003 widzów
AWBUD as a main subcontractor has completed shell structure of reinforced concrete and steel. Structure of the building is a pyramid with 50 x 50 m base and height of 32m.
"... At the edge of Pszczyna Forest, in a charming location on the shores of Paprocany Lake rises intriguing form of a pyramid-shaped building. Combining the root of the mystery of the East with modern technology implementation does not allow to overlook it. Great for almost 10 floors structure, of glass and granite, blends beautifully with the surrounding nature any time of day..."*
*info. www.piramida-ceglinski.pl
Client:
Inwestor Prywatny Localization:
Tychy Execution period:
2003 Contract net value:
< 20 mln PLN Surface:
8 100 m2 Cubature:
25 900 m3
Reinforced concrete Works for extension of „Cracovia” football stadium in Kraków. Scope of works included foundations and reinforced concrete structure of the west and south stand.
Client:
Konsorcjum Alpine - Budus S.A. Localization:
Kraków Execution period:
08.2009 – 12.2009 Contract net value:
< 20 mln PLN Reinforced concrete:
7 900 m3
Residential complex located in a prestigious center of Pruszków for which AWBUD made comprehensive reinforced concrete works. Works were carried out for 8 segment multi-family building with a height of 1 to 6 floors. The scope of investment included, construction of pillars, walls and ceilings with surface of 9 thous. sq. m.
Client:
EBB Nieruchomo¶ci Sp. z o.o. Localization:
Pruszków Execution period:
07.2008 – 12.2008 Contract net value:
< 20 mln PLN Surface:
3 500 m3
In September 2007, AWBUD have completed reinforced concrete works for most modern conference and exhibition center on southern Poland, located on area of former Silma factory. Surface of exhibition pavilion is over 13 thous. sq. m., and external part of the center is next 20 thous. sq. m. of surface.
Client:
Condite Sp. z o.o. Localization:
Sosnowiec Execution period:
03.2007 – 06.2007 Contract net value:
< 5 mln PLN Surface:
13 000 m2 Cubature:
20 000 m3 Foundations:
1440 m2
Pipes:
470 mb
Complete reinforced concrete works of pools basins for NEMO - Water World park in D±browa Górnicza which is one of the largest structures of this kind in the Silesian region.
It’s located in the Gen. J. Haller city park and occupy about 5 hectares of land. Investment included indoor and outdoor (summer and winter) pools, sauna, bowling center, cafes, bars, restaurants and disco.
.
Client:
Mitex S.A. Localization:
D±browa Górnicza Execution period:
07.2003 – 09.2003 Contract net value:
< 5 mln PLN Surface:
6 335 m2 Cubature:
31 350 m3
Housing investment near Kraków – in “Klin” district. Urban design for investment and neighboring Fort “Bobrek” was made by Miastoprojekt-Kraków. Scope of works include reinforced concrete works for 18 buildings (3 and 4 storey) and 12 terraced houses (2 storey).
nazwa zadania:
Kompleksowe roboty żelbetowe osiedla „Pod Fortem” Client:
Mostostal - Ventures Sp. z o.o. Localization:
Kraków Execution period:
11.2006 – 11.2007 Contract net value:
< 20 mln PLN Surface:
25 000 m2
Contract within construction of new "City - Garden" housing estate in Gliwice. AWBUD under contract of the investor performed comprehensive reinforced concrete works for a 5 storey multi-family building. The building is located at the intersection and Labedzka and Kozielska St. on the area of 26 thous. sq. m., and was designed in modern architecture. Scope of works included foundations, and reinforced concrete walls and ceilings.
nazwa zadania:
Roboty żelbetowe - osiedle „Miasto-Ogród” Client:
Radan Sp. z o.o. Localization:
Gliwice Execution period:
07.2008 – 02.2009 Contract net value:
< 5 mln PLN Surface:
6 032 m2 Reinforced concrete works:
2 100 m3